000 01228nam a2200349 a 4500
005 20250930145322.0
008 130829s1982 caua i000 0 eng d
020 _cHadiah
039 9 _a201309221630
_bwahida
_y08-29-2013
_zasrul
040 _aUKM
090 _aRAND 7
_bN-1882-AF 1982
100 1 _aBirkler, J. L.,
_d1944-
245 1 0 _aDevelopment and production cost estimating relationships for aircraft turbine engines /
_cJ. L. Birkler, J. B. Garfinkle, K. E. Marks ; prepared for the United States Air Force.
260 _aCalifornia :
_bRand Corporation,
_c1982.
300 _axiii, 68 p. :
_bill. ;
_c28 cm.
490 1 _aA Rand note ;
_vN-1882-AF
504 _aIncludes bibliographical references.
650 0 _aAirplanes
_xTurbojet engines
650 0 _aCost effectiveness
700 1 _aGarfinkle, J. B.
700 1 _aMarks, K. E.
710 1 _aUnited States.
_bAir Force
710 2 _aRand Corporation.
_947392
830 0 _aRand note ;
_vN-1882-AF.
907 _a.b15712643
_b2022-11-17
_c2019-11-12
942 _c4
_n0
_kRAND 7 N-1882-AF 1982
914 _avtls003538354
990 _aasr
991 _aKoleksi Dokumen
998 _at
_b2013-03-08
_cm
_da
_feng
_gcau
_y0
_z.b15712643
999 _c682839
_d682839