| 000 | 01120nam a2200313 a 4500 | ||
|---|---|---|---|
| 005 | 20250930145322.0 | ||
| 008 | 130829s1982 caua i000 0 eng d | ||
| 020 | _cHadiah | ||
| 039 | 9 |
_a201309221628 _bwahida _c201308291355 _dasrul _y08-29-2013 _zasrul |
|
| 040 | _aUKM | ||
| 090 |
_aRAND 7 _bN-1883-AF 1982 |
||
| 100 | 1 | _aWegner, Louis H. | |
| 245 | 1 | 4 |
_aThe taxiway repair schedule problem : _ba heuristic rule and a branch-and-bound solution / _cLouis H. Wegner |
| 260 |
_aCalifornia : _bRand Corporation, _c1982. |
||
| 300 |
_aix, 31 p. : _bill. ; _c28 cm. |
||
| 490 | 1 |
_aA Rand note ; _vN-1883-AF |
|
| 504 | _aIncludes bibliographical references. | ||
| 650 | 0 |
_aAir bases, American _xRunways _xMaintenance and repair _xMathematical models |
|
| 710 | 1 |
_aUnited States. _bAir Force |
|
| 710 | 2 |
_aRand Corporation. _947392 |
|
| 830 | 0 |
_aRand note ; _vN-1883-AF. |
|
| 907 |
_a.b1571262x _b2022-11-17 _c2019-11-12 |
||
| 942 |
_c4 _n0 _kRAND 7 N-1883-AF 1982 |
||
| 914 | _avtls003538352 | ||
| 990 | _aasr | ||
| 991 | _aKoleksi Dokumen | ||
| 998 |
_at _b2013-03-08 _cm _da _feng _gcau _y0 _z.b1571262x |
||
| 999 |
_c682837 _d682837 |
||