000 01120nam a2200313 a 4500
005 20250930145322.0
008 130829s1982 caua i000 0 eng d
020 _cHadiah
039 9 _a201309221628
_bwahida
_c201308291355
_dasrul
_y08-29-2013
_zasrul
040 _aUKM
090 _aRAND 7
_bN-1883-AF 1982
100 1 _aWegner, Louis H.
245 1 4 _aThe taxiway repair schedule problem :
_ba heuristic rule and a branch-and-bound solution /
_cLouis H. Wegner
260 _aCalifornia :
_bRand Corporation,
_c1982.
300 _aix, 31 p. :
_bill. ;
_c28 cm.
490 1 _aA Rand note ;
_vN-1883-AF
504 _aIncludes bibliographical references.
650 0 _aAir bases, American
_xRunways
_xMaintenance and repair
_xMathematical models
710 1 _aUnited States.
_bAir Force
710 2 _aRand Corporation.
_947392
830 0 _aRand note ;
_vN-1883-AF.
907 _a.b1571262x
_b2022-11-17
_c2019-11-12
942 _c4
_n0
_kRAND 7 N-1883-AF 1982
914 _avtls003538352
990 _aasr
991 _aKoleksi Dokumen
998 _at
_b2013-03-08
_cm
_da
_feng
_gcau
_y0
_z.b1571262x
999 _c682837
_d682837