000 01626nam a2200385 a 4500
005 20250930142138.0
008 180122s2017 my ao g bm 000 0 eng d
020 _cHadiah.
039 9 _a201901310915
_bhayat
_c201803151216
_dlan
_c201803151205
_dlan
_c201803140846
_djamain
_y01-22-2018
_zazam
040 _aUKM
_erda
090 _aTA444.M836 2017 3 tesis
090 _aTA444
_b.M836 2017 3
100 0 _aMohammed Hakimi Abdul Razak,
_eauthor.
245 1 0 _aProposed framework for defects occurrences on precast segment from manufacturing to lining erection phases in case of line one Klang Valley mass rapid transit tunnel construction /
_cMohammed Hakimi bin Abdul Razak.
264 4 _c©2017.
300 _axv, 134 pages :
_billustrations ;
_c30 cm.
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
338 _avolume
_2rdacarrier
500 _aCd yang di sertakan duplikasi kepada tesis bercetak dan tidak boleh di rujuk / di pinjam.
502 _aTesis ( Sarjana Sains )- Universiti Kebangsaan Malaysia, 2017.
504 _aReferences : page 108-112.
610 2 0 _aUniversiti Kebangsaan Malaysia
_xDissertations.
_962865
650 0 _aDissertations, Academic
_zMalaysia.
_962866
650 0 _aFiber-reinforced concrete
_xCracking.
650 0 _aTunneling.
650 0 _aUnderground construction.
907 _a.b16557128
_b2025-07-18
_c2019-11-12
942 _c3
_n0
_kTA444.M836 2017 3 tesis
914 _avtls003630722
990 _aaaw/jm
991 _aFaculty of Engineering and Built Environment, UKM
998 _al
_b2018-09-01
_cm
_dx
_feng
_gmy
_y0
_z.b16557128
999 _c624214
_d624214