| 000 | 01484nam a2200373 i 4500 | ||
|---|---|---|---|
| 005 | 20250919090002.0 | ||
| 008 | 170208s2008 my a 000 0 eng d | ||
| 020 | _cRM48.00 | ||
| 039 | 9 |
_a201704171252 _bmadihah _c201704121113 _dmuhaimin _c201703210929 _dzaiful _c201702081147 _dzaiful _y02-08-2017 _zzaiful |
|
| 040 |
_aUKM _erda |
||
| 090 |
_aMK10 JKR 17 _bR62 S4 2008 |
||
| 245 | 0 | 0 |
_aStandard specification for road works. _nSection 4 : _bflexible pavement. |
| 246 | 3 | 0 | _aFlexible pavement |
| 264 | 0 |
_aKuala Lumpur : _bJabatan Kerja Raya Malaysia, _c2008. |
|
| 300 |
_aiv, 161 pages : _billustrations ; _c29 cm. |
||
| 336 |
_atext _2rdacontent. |
||
| 337 |
_aunmediated _2rdamedia. |
||
| 338 |
_avolume _2rdacarrier. |
||
| 490 | 0 |
_aStandard specification for road works. _vsection 4 : flexible pavement |
|
| 500 | _a'JKR/SPJ/2008-S4.'--Cover. | ||
| 500 | _a'JKR 20403-0003-07.'--Cover. | ||
| 650 | 0 |
_aPavements _xDesign and construction _xStandards _zMalaysia. |
|
| 650 | 0 |
_aPavements, Asphalt _xStandards _zMalaysia. |
|
| 650 | 0 |
_aLane lines (Roads) _xStandards _zMalaysia. |
|
| 710 | 1 |
_aMalaysia. _bJabatan Kerja Raya. _bCawangan Jalan. |
|
| 830 |
_aStandard specification for road works. _vsection 4 : flexible pavement |
||
| 907 |
_a.b16426873 _b2019-11-12 _c2019-11-12 |
||
| 942 |
_c4 _n0 _kMK10 JKR 17 R62 S4 2008 |
||
| 914 | _avtls003616888 | ||
| 990 | _azear | ||
| 991 | _aKoleksi Dokumen | ||
| 998 |
_at _b2017-08-02 _cm _da _feng _gmy _y0 _z.b16426873 |
||
| 999 |
_c615936 _d615936 |
||