000 00858nam a2200265 a 4500
005 20250930093719.0
008 981208s1985 us 00 eng d
020 _a0878142657
039 9 _a200901201232
_bzaina
_y08-18-1999
_zload
090 _a6 TN871.2.A33
090 _aTN871.2
_b.A33
100 1 _aAdams, Neal J.
245 1 0 _aDrilling engineering :
_ba complete well planning approach /
_cNeal J. Adams, Tommie Charrier
260 _aTulsa, Okla. :
_bPennWell,
_c1985
300 _a960 p. :
_bill. ;
_c24 cm.
650 0 _aOil well drilling
650 0 _aGas well drilling
_959882
700 1 _aCharrier, Tommie
907 _a.b10590407
_b2020-10-15
_c2019-11-12
942 _c01
_n0
_k6 TN871.2.A33
914 _avtls000061386
991 _aFakulti Sains dan Sumber Alam
998 _al
_b1999-05-08
_cm
_da
_feng
_g
_y0
_z.b10590407
999 _c60956
_d60956