| 000 | 00887nam a2200265 a 4500 | ||
|---|---|---|---|
| 005 | 20250918233733.0 | ||
| 008 | 140326 1974 njuaf b 001 0 eng d | ||
| 020 | _a0133356043 | ||
| 039 | 9 |
_a201403261151 _bjamil _c201403261147 _djamil _y03-26-2014 _zjamil |
|
| 040 | _aUKM | ||
| 090 | _aTH435.C65 3 | ||
| 090 |
_aTH435 _b.C65 3 |
||
| 100 | 1 |
_aCollier, Keith, _d1927- |
|
| 245 | 1 |
_aFundamentals of construction estimating and cost accounting / _cKeith Collier. |
|
| 260 |
_aEnglewood Cliffs, NJ : b Prentice-Hall, _cc1974 |
||
| 300 |
_axi, 296 p. , [43] : _bill. ; _c29 cm. |
||
| 500 | _aIncludes index. | ||
| 650 | 0 |
_aBuilding _xEstimates. |
|
| 650 | 0 |
_aConstruction industry _xAccounting. |
|
| 907 |
_a.b1585775x _b2019-11-12 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTH435.C65 3 |
||
| 914 | _avtls003554668 | ||
| 998 |
_al _b2014-01-03 _cm _da _feng _gnju _y0 _z.b1585775x |
||
| 999 |
_c565670 _d565670 |
||