000 01217nam a2200337 a 4500
005 20250930134928.0
008 131023s1987 caua i000 0 eng d
020 _cHadiah
039 9 _a201310251236
_bwahida
_y10-23-2013
_zasrul
040 _aUKM
090 _aRand 7 R367 1987
090 _aRand 7
_bR367 1987 N-2386-PSSP
100 1 _aMilanese, James J.
245 1 0 _aProcess industry contingency estimation :
_ba study of the ability to account for unforeseen costs /
_cJames J. Milanese ; prepared for the Private Sector Sponsors Program.
260 _aCalifornia :
_bRand Corporation,
_c1987.
300 _axiiii, 70 p. :
_bill. ;
_c28 cm.
490 1 _aA Rand note ;
_vN-2386-PSSP
504 _aIncludes bibliographical references.
650 0 _aChemical plants
_xEstimates
650 0 _aCosts, Industrial
710 1 _aUnited States.
_bPrivate Sector Sponsors Program.
710 2 _aRand Corporation.
_947392
830 0 _aRand note ;
_vN-2386-PSSP.
907 _a.b15755903
_b2019-11-12
_c2019-11-12
942 _c4
_n0
_kRand 7 R367 1987
914 _avtls003543129
990 _aasr
991 _aKoleksi Dokumen
998 _at
_b2013-10-10
_cm
_da
_feng
_gcau
_y0
_z.b15755903
999 _c555756
_d555756