| 000 | 01918nam a2200385Ia 4500 | ||
|---|---|---|---|
| 005 | 20250918192248.0 | ||
| 008 | 130705s2010 enkab bi 001 0 eng | ||
| 020 |
_a9780727731586 _cRM375.60 |
||
| 020 | _a0727731580 | ||
| 039 | 9 |
_a201311081603 _blan _c201310301511 _dbaiti _c201310301508 _dbaiti _c201310031608 _drahah _y07-05-2013 _zrahah |
|
| 040 |
_aUKM _cCUD _dFHATR _dUKM _dUKMGB _dUKM |
||
| 043 | _ae------ | ||
| 090 | _aTG300.C359 3 | ||
| 090 |
_aTG300 _b.C359 3 |
||
| 100 | 1 |
_aCalgaro, J. A. _q(Jean-Armand). |
|
| 245 | 1 | 0 |
_aDesigner's guide to Eurocode 1 : _bactions on bridges : EN 1991-2, EN 1991-1-1, -1-3 to -1-7 and EN 1990 annex A2 / _cJ.-A. Calgaro, M. Tschumi and H. Gulvanessian. |
| 260 |
_aLondon : _bThomas Telford, _c2010. |
||
| 300 |
_aix, 250 p. : _bill. maps ; _c31 cm. |
||
| 490 | 1 | _aEurocode designers' guide series. | |
| 500 | _a'Eurocodes Expert ... a new ICE and Thomas Telford initiative set up to assist in creating a greater awareness of the impact and implementation of the Eurocodes within the UK construction industry' - t.p. verso. | ||
| 504 | _aIncludes bibliographical references and index. | ||
| 520 | _aThe design process of a bridge includes several steps. One of the major steps is the determination of actions & combinations of actions. These actions are imposed loads due to traffic, climatic actions, actions due to water or soil subsidence, construction loads & accidental actions. | ||
| 650 | 0 |
_aBridges _xDesign and construction _xStandards _zEurope. |
|
| 650 | 0 | _aEN1991 Eurocode 1 (Standard). | |
| 700 | 1 |
_aTschumi, M. _q(Marcel). |
|
| 700 | 1 | _aGulvanessian, H. | |
| 830 | _aEurocode designers' guide series. | ||
| 907 |
_a.b15677965 _b2019-11-12 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTG300.C359 3 |
||
| 914 | _avtls003534504 | ||
| 990 | _abaiti | ||
| 991 | _aFakulti Kejuruteraan | ||
| 998 |
_al _b2013-05-07 _cm _da _feng _genk _y0 _z.b15677965 |
||
| 999 |
_c550422 _d550422 |
||