| 000 | 01177nam a2200337 a 4500 | ||
|---|---|---|---|
| 005 | 20250918165105.0 | ||
| 008 | 120830s2011 enka b 001 0 eng | ||
| 020 |
_a9780415601689 (hbk.) _cRM474.05 |
||
| 020 | _a9780415601696 (pbk.) | ||
| 039 | 9 |
_a201209241231 _bzabidah _c201209181802 _dzaina _c201208301612 _didah _y08-30-2012 _zidah |
|
| 040 |
_aDLC _cDLC _dYDX _dBTCTA _dYDXCP _dCDX _dVP@ _dDLC _dUKM |
||
| 090 | _aT56.8.U364 2011 3 | ||
| 090 |
_aT56.8 _b.U364 2011 3 |
||
| 100 | 1 | _aUher, Thomas E. | |
| 245 | 1 | 0 |
_aProgramming and scheduling techniques / _cThomas E. Uher and Adam S. Zantis. |
| 250 | _a2nd ed. | ||
| 260 |
_aLondon : _bSpon Press, _c2011. |
||
| 300 |
_axviii, 281 p. : _bill. ; _c25 cm. |
||
| 504 | _aIncludes bibliographical references and index. | ||
| 650 | 0 | _aProject management. | |
| 650 | 0 | _aStrategic planning. | |
| 650 | 0 | _aProduction scheduling. | |
| 700 | 1 | _aZantis, Adam S. | |
| 907 |
_a.b15460733 _b2019-11-12 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kT56.8.U364 2011 3 |
||
| 914 | _avtls003511419 | ||
| 990 | _azsz | ||
| 991 | _aFakulti Kejuruteraan dan Alam Bina | ||
| 998 |
_al _b2012-04-08 _cm _da _feng _genk _y0 _z.b15460733 |
||
| 999 |
_c529332 _d529332 |
||