| 000 | 01028nam a2200313 a 4500 | ||
|---|---|---|---|
| 005 | 20250918151228.0 | ||
| 008 | 120301s2012 maua b 001 0 eng | ||
| 020 |
_a9780132473989 (hbk.) _cRM380.67 |
||
| 020 | _a0132473984 (hbk.) | ||
| 039 | 9 |
_a201203220904 _bzabidah _y03-01-2012 _zlatihan |
|
| 040 | _aUKM | ||
| 090 | _aTH438.4.H566 2012 3 | ||
| 090 |
_aTH438.4 _b.H566 2012 3 |
||
| 100 | 1 | _aHinze, Jimmie W. | |
| 245 | 1 | 0 |
_aConstruction planning and scheduling / _cJimmie W. Hinze. |
| 250 | _a4th ed. | ||
| 260 |
_aBoston, Mass. : _bPrentice Hall, _c2012. |
||
| 300 |
_aviii, 256 p. : _bill. ; _c29 cm. |
||
| 504 | _aIncludes bibliographical references and index. | ||
| 650 | 0 |
_aBuilding _xSuperintendence. |
|
| 650 | 0 | _aProduction scheduling. | |
| 907 |
_a.b15258798 _b2021-05-28 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTH438.4.H566 2012 3 |
||
| 914 | _avtls003489511 | ||
| 990 | _aza | ||
| 991 | _aFakulti Kejuruteraan dan Alam Bina | ||
| 998 |
_at _b2012-01-03 _cm _da _feng _gmau _y0 _z.b15258798 |
||
| 999 |
_c509950 _d509950 |
||