000 02166nam a2200469 a 4500
005 20250918122516.0
008 101012s2009 flua 001 0 eng
020 _a9781420090161 (vol. 1) :
_cRM88.20
020 _a9781420090246 (vol. 2) :
_cRM88.20
020 _a9781420090260 (vol. 3) :
_cRM88.20
020 _a9781420090284 (vol. 4) :
_cRM88.20
020 _a9781420090307 (vol. 5) :
_cRM88.20
020 _a9781420090321 (vol. 6) :
_cRM88.20
020 _a9781420090130 (1 set) :
_cRM529.25
039 9 _a201011011305
_bzabidah
_c201011011248
_dzabidah
_c201010281240
_dfati
_y10-12-2010
_zrahah
040 _aUKM
090 _aTS157.4.H57713 2009
090 _aTS157.4
_b.H57713 2009
100 1 _aHirano, Hiroyuki
245 1 0 _aJIT implementation manual :
_bthe complete guide to just-in-time manufacturing /
_cHiroyuki Hirano
246 3 _aJust-in-time implementation manual
250 _a2nd ed.
260 _aBoca Raton, Fla. :
_bCRC Press,
_c2009
300 _a6 v. :
_bill. ;
_c28 cm.
505 _gv. 1.
_tThe just-in -time production system -
_gv. 2.
_tWaste and the 5S's -
_gv. 3.
_tFlow manufacturing - multi-process operations and kanban -
_gv. 4.
_tLeveling - changeover and quality assurance -
_gv. 5.
_tStandardized operations - jidoka and maintenance/safety -
_gv. 6.
_tJIT implementation forms and charts
534 _pOriginal title :
_tJasuto in taimu seisan kakumei shido manyuaru
650 0 _aJust-in-time systems
650 0 _aProduction control
740 4 2 _aThe just-in -time production system ;
_nvol. 1
740 0 2 _aWaste and the 5S's ;
_nvol. 2
740 0 2 _aFlow manufacturing - multi-process operations and kanban ;
_nvol. 3
740 0 2 _aLeveling - changeover and quality assurance ;
_nvol. 4
740 0 2 _aStandardized operations - jidoka and maintenance/safety ;
_nvol. 5
740 0 2 _aJIT implementation forms and charts ;
_nvol. 6
907 _a.b14813130
_b2021-05-28
_c2019-11-12
942 _c01
_n0
_kTS157.4.H57713 2009
914 _avtls003442595
990 _afka/za
991 _aPusat Pengajian Sains Sekitaran & Sumber Alam
998 _al
_b2010-12-10
_cm
_da
_feng
_gflu
_y0
_z.b14813130
999 _c468038
_d468038