| 000 | 00843nam a2200265 a 4500 | ||
|---|---|---|---|
| 005 | 20250913113944.0 | ||
| 008 | 981208s1982 us 00 eng d | ||
| 010 | _a81-5211 | ||
| 020 | _a0131687573 | ||
| 039 | 9 |
_a200712211550 _bnorsiah _y08-18-1999 _zload |
|
| 090 | _aTH435.N34 | ||
| 090 |
_aTH435 _b.N34 |
||
| 100 | 1 | _aNeil, James M. | |
| 245 | 1 | 0 |
_aConstruction cost estimating for project control / _cby James M. Neil |
| 260 |
_aEnglewood Cliffs, N.J. : _bPrentice-Hall, _c1982 |
||
| 300 |
_a331p.: _bill. ; _c24 cm. |
||
| 650 | 0 |
_aBuilding _xEstimates |
|
| 650 | 0 |
_aConstruction industry _xManagement |
|
| 907 |
_a.b10441700 _b2021-05-28 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTH435.N34 |
||
| 914 | _avtls000045984 | ||
| 991 | _aFakulti Sains Fizik dan Gunaan | ||
| 998 |
_al _b1999-05-08 _cm _da _feng _g _y0 _z.b10441700 |
||
| 999 |
_c46128 _d46128 |
||