| 000 | 01786nam a2200373 a 4500 | ||
|---|---|---|---|
| 005 | 20250930130147.0 | ||
| 008 | 091103u20089999my a g s l000 0 mul d | ||
| 020 | _cHadiah | ||
| 022 | _a0127-8568 | ||
| 022 | _a1985-4285 | ||
| 039 | 9 |
_a201907021650 _bmohaini _c201906211508 _dmohaini _c201808301257 _dmadihah _c201512301109 _drosmarila _y11-03-2009 _zrosmarila |
|
| 040 | _aUKM | ||
| 090 | _aMK10 JPER 4 S524(1) | ||
| 245 | 0 | 0 |
_aSiaran khas 1 : _b(untuk kerja-kerja kejuruteraan awam) = Special release 1 : (for civil engineering works), Sabah dan Sarawak / _cJabatan Perangkaan Negara. |
| 246 | 3 | 1 | _aSpecial release 1 : (for civil engineering works), Sabah dan Sarawak |
| 260 |
_aPutrajaya : _bJabatan Perangkaan, _c2008- |
||
| 300 |
_av. (various pagings) : _bill. ; _c29 cm. |
||
| 500 | _aPTSL : 2008; 2009; 2012(Jun-Dis); 2013; 2014; 2016; 2017; 2018 ; 2019 ; 2020 (Julai),2020, (Ogos) 2021, (September) 2021, (Disember) 2021, (Januari) 2022, (Februari) 2022. | ||
| 520 | _aJadual 1: Harga unit purata bagi bar keluli dan sistem -- Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel -- Jadual 3: Harga unit purata bagi pasir, batu baur -- Nota teknikal. | ||
| 650 | 0 |
_aCivil engineering _zSabah _vPeriodicals. |
|
| 650 | 0 |
_aCivil engineering _zSarawak _vPeriodicals. |
|
| 650 | 0 |
_aMaterials _zSabah _vPeriodicals. |
|
| 650 | 0 |
_aMaterials _zSarawak _vPeriodicals. |
|
| 710 | 1 |
_aMalaysia. _bJabatan Perangkaan _949579 |
|
| 856 | 4 | 2 | _uhttp://www.statistics.gov.my |
| 907 |
_a.b14618369 _b2022-08-24 _c2019-11-12 |
||
| 942 |
_c4 _n0 _kMK10 JPER 4 S524(1) |
||
| 914 | _avtls003422156 | ||
| 949 |
_a101011579 _o101013163 (Julai 2020) |
||
| 990 | _aswa | ||
| 991 | _aKoleksi Dokumen | ||
| 998 |
_at _b2009-03-11 _cm _da _fmul _gmy _y0 _z.b14618369 |
||
| 999 |
_c453617 _d453617 |
||