| 000 | 01409cam a22003498a 4500 | ||
|---|---|---|---|
| 005 | 20250918004353.0 | ||
| 008 | 090306s2008 nju b 001 0 eng | ||
| 020 |
_a9781848210172 _cRM676.92 |
||
| 039 | 9 |
_a200904291228 _bariff _c200904241005 _drahah _y03-06-2009 _zidah |
|
| 040 | _aUKM | ||
| 090 | _aTS157.5.P7513 3 | ||
| 090 |
_aTS157.5 _b.P7513 2008 |
||
| 240 | 1 | 0 |
_aOrdonnancement de la production. _lEnglish |
| 245 | 1 | 0 |
_aProduction scheduling / _cedited by Pierre Lopez, Francois Roubellat |
| 260 |
_aHoboken, NJ : _bJohn Wiley & Sons, _c2008 |
||
| 300 |
_axii, 375 p. : _bill. ; _c24 cm. |
||
| 504 | _aIncludes bibliographical references and index | ||
| 650 | 0 | _aProduction scheduling | |
| 650 | 0 | _aInventory control | |
| 700 | 1 | _aLopez, Pierre | |
| 700 | 1 | _aRoubellat, Francois | |
| 856 | 4 |
_3Contributor biographical information _uhttp://www.loc.gov/catdir/enhancements/fy0806/2007043950-b.html |
|
| 856 | 4 |
_3Publisher description _uhttp://www.loc.gov/catdir/enhancements/fy0806/2007043950-d.html |
|
| 856 | 4 |
_3Table of contents only _uhttp://www.loc.gov/catdir/enhancements/fy0806/2007043950-t.html |
|
| 907 |
_a.b14431002 _b2020-10-15 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTS157.5.P7513 3 |
||
| 914 | _avtls003402322 | ||
| 990 | _amaa | ||
| 991 | _aProgram Kejuruteraan Eklektrik, Elektronik & Sistem (KES) | ||
| 998 |
_al _b2009-06-03 _cm _da _feng _gnju _y0 _z.b14431002 |
||
| 999 |
_c435659 _d435659 |
||