000 01384nam a2200373 i 4500
005 20250918001901.0
006 m q d
007 cr nn 008maaau
008 100623s2008 enk q j eng d
020 _a9781848002258 (electronic bk.)
020 _a9781848002241 (paper)
035 _a(Springer)978-1-84800-224-1
039 9 _a201006230943
_bmuhaimin
_c201006221819
_dmuhaimin
_y02-02-2009
_zmuhaimin
082 0 4 _a338.47629222
_222
090 _aebooks
090 _aTL215.M4
_bB932 2008
245 0 0 _aBuild To Order
_h[electronic resource] :
_bThe Road to the 5-Day Car /
_cedited by Glenn Parry, Andrew Graves.
260 _aLondon :
_bSpringer-Verlag,
_c2008.
300 _axx, 438 p. :
_bill., digital ;
_c24 cm.
650 0 _aAutomobile industry and trade
_xProduction control.
650 0 _aJust-in-time systems.
650 0 _aManufacturing resource planning.
700 1 _aParry, Glenn.
700 1 _aGraves, Andrew.
710 2 _aSpringerLink (Online service)
773 0 _tSpringer eBooks
856 4 0 _uhttps://eresourcesptsl.ukm.remotexs.co/login?url=http://dx.doi.org/10.1007/978-1-84800-225-8
907 _a.b14371091
_b2024-11-08
_c2019-11-12
942 _c01
_n0
_kebooks
914 _avtls003395969
998 _ae
_b2009-02-02
_cm
_dz
_feng
_genk
_y0
_z.b14371091
999 _c431870
_d431870