000 01565nam a22004095a 4500
005 20250914173356.0
006 m d
007 cr nn 008maaau
008 090204s2007 enk j eng d
020 _a9781846287527 (electronic bk.)
035 _a(Springer)978-1-84628-751-0
039 9 _a200902042122
_bmuhaimin
_y04-07-2008
_zmuhaimin
082 0 0 _a658.503
_222
245 0 0 _aProcess Planning and Scheduling for Distributed Manufacturing
_h[electronic resource] /
_cedited by Lihui Wang, Weiming Shen.
260 _aLondon :
_bSpringer-Verlag London Limited,
_c2007.
300 _axix, 429 p. :
_bill., digital ;
_c24 cm.
490 0 _aSpringer Series in Advanced Manufacturing,
_x1860-5168
650 0 _aManufacturing resource planning.
650 0 _aProduction scheduling.
650 0 _aProduction planning
_xData processing.
650 1 4 _aEngineering.
650 2 4 _aIndustrial and Production Engineering.
650 2 4 _aControl Engineering.
650 2 4 _aComputer-Aided Engineering (CAD, CAE) and Design.
650 2 4 _aProduction/Logistics.
700 1 _aWang, Lihui.
700 1 _aShen, Weiming.
710 2 _aSpringerLink (Online service)
773 0 _tSpringer e-books
856 4 0 _uhttps://eresourcesptsl.ukm.remotexs.co/user/login?url=http://dx.doi.org/10.1007/978-1-84628-752-7
907 _a.b1416629x
_b2024-01-19
_c2019-11-12
942 _n0
914 _avtls003374289
998 _ae
_b2008-07-04
_cm
_da
_feng
_genk
_y0
_z.b1416629x
999 _c412204
_d412204