000 01268cam a22003134a 4500
005 20250930123236.0
008 070917s2002 maua 001 0 eng
020 _a0072435801 (alk. paper)
039 9 _y09-17-2007
_zrahah
043 _an-us---
050 0 0 _aTH435
_b.P47 2002
100 1 _aPeurifoy, R. L.
_q(Robert Leroy),
_d1902-1995.
_956639
245 1 0 _aEstimating construction costs /
_cRobert L. Peurifoy, Garold D. Oberlender.
250 _a5th ed.
260 _aBoston :
_bMcGraw-Hill,
_cc2002.
300 _axvi, 560 p. :
_bill. ;
_c25 cm.
440 4 _aThe McGraw-Hill series in construction engineering and project management
500 _aIncludes index.
650 0 _aBuilding
_xEstimates
_zUnited States.
700 1 _aOberlender, Garold D.
856 4 2 _3Publisher description
_uhttp://www.loc.gov/catdir/enhancements/fy0702/2001041039-d.html
856 4 1 _3Table of contents only
_uhttp://www.loc.gov/catdir/enhancements/fy0702/2001041039-t.html
856 4 2 _3Contributor biographical information
_uhttp://www.loc.gov/catdir/enhancements/fy0735/2001041039-b.html
907 _a.b14005761
_b2019-11-13
_c2019-11-12
942 _n0
914 _avtls003357408
998 _anone
_b2007-04-09
_cm
_da
_feng
_gmau
_y0
_z.b14005761
999 _c396933
_d396933