000 01335nam a2200325 a 4500
005 20250914160500.0
008 070423s2006 enka b 001 0 eng
020 _a0415346576 (hbk.)
_cRM508.50
020 _a04145346584 (pbk.)
039 9 _a200707100946
_bbedah
_c200706190938
_drasyilla
_c200704231452
_drahah
_y04-23-2007
_zrahah
090 _aTH437.E436 pasca
090 _aTH437
_b.E436
100 1 _aEllingham, Ian
245 1 0 _aNew generation whole-life costing :
_bproperty and construction decision-making under uncertainty/
_cIan Ellingham and William Fawcett
260 _aLondon :
_bTaylor & Francis,
_c2006
300 _axiv, 208 p. :
_bill. ;
_c25 cm.
504 _aIncludes bibliographical references and index
650 0 _aBuilding
_xEstimates
_vCase studies
650 0 _aLife cycle costing
_vCase studies
650 0 _aBuildings
_zGreat Britain
_xMaintenance and repair
_xCost effectiveness
_vCase studies
700 1 _aFawcett, William
856 4 1 _3Table of contents only
_uhttp://www.loc.gov/catdir/toc/ecip066/2006000853.html
907 _a.b13908558
_b2021-05-28
_c2019-11-12
942 _c01
_n0
_kTH437.E436 pasca
914 _avtls003346798
990 _aza
991 _aInstitut Kejuruteraan Mikro & Nanoelektronik - Pasca
998 _al
_b2007-10-04
_cm
_da
_feng
_genk
_y0
_z.b13908558
999 _c387801
_d387801