| 000 | 01029cam a22002774a 4500 | ||
|---|---|---|---|
| 005 | 20250914143431.0 | ||
| 008 | 060421s2005 xxua f 000 0 eng c | ||
| 020 |
_a0071445854 (hbk.) _cRM334.61 |
||
| 039 | 9 |
_a200609261525 _bjamil _c200608161223 _didah _c200605081659 _dzakir _y05-08-2006 _zzakir |
|
| 090 | _aTS156.8.M85 | ||
| 090 |
_aTS156.8 _b.M85 |
||
| 100 | 1 |
_aMuir, Alastair K. S. _q(Alastair Kerr S.), _d1957- |
|
| 245 | 1 | 0 |
_aLean Six sigma statistics : _bcalculating process efficiencies in transactional projects / _cAlastair K. Muir |
| 260 |
_aNew York : _bMcGraw-Hill, _c2006 |
||
| 300 |
_axv, 333p. : _bill. ; _c24 cm. |
||
| 440 | 0 | _aSix sigma operational methods series | |
| 650 | 0 | _aSix Sigma (Quality control standard) | |
| 650 | 0 |
_aProcess control _xStatistical methods. |
|
| 907 |
_a.b13724939 _b2021-05-28 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTS156.8.M85 |
||
| 914 | _avtls003326724 | ||
| 990 | _ajj | ||
| 991 | _aProgram Statistik | ||
| 998 |
_al _b2006-08-05 _cm _da _feng _gxxu _y0 _z.b13724939 |
||
| 999 |
_c370951 _d370951 |
||