| 000 | 01022nam a22002898a 4500 | ||
|---|---|---|---|
| 005 | 20250914131941.0 | ||
| 008 | 040131s2001 xxkd 1 00i 0 eng | ||
| 020 |
_a041524417X _cRM404.52 |
||
| 039 | 9 |
_a200406221229 _bhamka _c200406141615 _djamil _c200405241749 _dsanusi _c200401310937 _dhamzah _y01-31-2004 _zhamzah |
|
| 090 | _aTH438.4.A334 3 | ||
| 090 | _aTH438.4 | ||
| 100 | 1 |
_aAdeli, Hojjat, _d1950- |
|
| 245 | 1 | 0 |
_aConstruction scheduling, cost optimization, and management / _cH. Adeli and A. Karim. |
| 260 |
_aLondon : _bSpon, _c2001 |
||
| 300 |
_axvi, 320 p. : _bill. ; _c23 cm. |
||
| 650 | 0 |
_aConstruction industry _xManagement |
|
| 650 | 0 | _aProduction scheduling | |
| 650 | 0 |
_aBuilding _xCost control |
|
| 700 | 1 |
_aKarim, Asim Salimul, _d1971- |
|
| 907 |
_a.b13325462 _b2021-05-28 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTH438.4.A334 3 |
||
| 914 | _avtls003283938 | ||
| 991 | _aFakulti Kejuruteraan | ||
| 991 | _aPasca Siswazah KEJ-P | ||
| 998 |
_al _b2004-05-01 _cm _da _feng _gxxk _y0 _z.b13325462 |
||
| 999 |
_c331953 _d331953 |
||