000 01022nam a22002898a 4500
005 20250914131941.0
008 040131s2001 xxkd 1 00i 0 eng
020 _a041524417X
_cRM404.52
039 9 _a200406221229
_bhamka
_c200406141615
_djamil
_c200405241749
_dsanusi
_c200401310937
_dhamzah
_y01-31-2004
_zhamzah
090 _aTH438.4.A334 3
090 _aTH438.4
100 1 _aAdeli, Hojjat,
_d1950-
245 1 0 _aConstruction scheduling, cost optimization, and management /
_cH. Adeli and A. Karim.
260 _aLondon :
_bSpon,
_c2001
300 _axvi, 320 p. :
_bill. ;
_c23 cm.
650 0 _aConstruction industry
_xManagement
650 0 _aProduction scheduling
650 0 _aBuilding
_xCost control
700 1 _aKarim, Asim Salimul,
_d1971-
907 _a.b13325462
_b2021-05-28
_c2019-11-12
942 _c01
_n0
_kTH438.4.A334 3
914 _avtls003283938
991 _aFakulti Kejuruteraan
991 _aPasca Siswazah KEJ-P
998 _al
_b2004-05-01
_cm
_da
_feng
_gxxk
_y0
_z.b13325462
999 _c331953
_d331953