000 01772cam a22003494a 4500
005 20250914122545.0
008 020401s2001 xxuab b f000 0 eng
020 _a0607964405 (pbk.)
035 _a(DLC)2001023208
039 9 _a200901050938
_bwahida
_c200207191045
_dnorjismi
_y04-01-2002
_zariff
100 1 _aBarlow, Paul M.
245 1 0 _aNumerical-simulation and conjunctive-management models of the Hunt-Annaquatucket-Pettaquamscutt stream-aquifer system, Rhode Island /
_cby Paul M. Barlow and David C. Dickerman.
260 _aDenver, CO :
_bU.S. Geological Survey, Branch of Information Services,
_c2001.
300 _avi, 88 p. :
_bill., col. maps ;
_c29 cm. +
_e1 folded map in pocket.
440 0 _aU.S. Geological Survey professional paper ;
_v1636
500 _a'Prepared in cooperation with the Town of North Kingstown; Rhode Island Department of Environmental Management; Rhode Island Water Resources Board, and the Rhode Island Economic Development Corporation.'
504 _aIncludes bibliographical references (p. 64-66).
650 0 _aStreamflow
_zRhode Island
_zHunt River
_xMathematical models.
650 0 _aStreamflow
_zRhode Island
_zAnnaqutucket River
_xMathematical models.
650 0 _aStreamflow
_zRhode Island
_zPettaquamscutt River
_xMathematical models.
700 1 _aDickerman, David C.
710 2 _aRhode Island.
_bDept. of Environmental Management.
710 2 _aRhode Island.
_bWater Resources Board.
710 2 _aRhode Island Port Authority and Economic Development Corporation.
710 _aU.S. Geological Survey
907 _a.b13001127
_b2019-11-12
_c2019-11-12
942 _c4
_n0
914 _avtls000312209
991 _aKoleksi Dokumen
998 _at
_b2002-01-04
_cm
_da
_feng
_gxxu
_y0
_z.b13001127
999 _c300454
_d300454