000 01181 am a2200301 4500
005 20250930113401.0
008 020107s1983 fr a i000 0 eng d
020 _a9264125140
039 9 _a201311221538
_bwahida
_c201311081140
_dlatihankat
_c201311081138
_dlatihankat
_y01-07-2002
_znorjismi
040 _aUKM
090 _aOECD NEA 3 N833
090 _aOECD NEA 3
_bN833 1983
245 0 4 _aThe costs of generating electricity in nuclear and coal fired power stations :
_ba report /
_cby an Expert Group
260 _aParis :
_bOECD,
_c1983
300 _a60 p. :
_bill. ;
_c27 cm.
504 _aIncludes bibliographical references (p.46-48)
650 0 _aElectric utilities
_zEurope
_xCosts
_zCase studies
650 0 _aElectric utilities
_zUnited States
_xCosts
_zCase studies
650 0 _aElectric utilities
_zCanada
_xCosts
_zCase studies
710 2 _aOrganisation for Economic Co-operation and Development
_943115
710 2 _aNuclear Energy Agency
907 _a.b12953660
_b2021-05-28
_c2019-11-12
942 _c4
_n0
_kOECD NEA 3 N833
914 _avtls000307084
991 _aKoleksi Dokumen
998 _at
_b2002-07-01
_cm
_da
_feng
_gfr
_y0
_z.b12953660
999 _c295808
_d295808