000 01340nam a2200325 4500
005 20250930113221.0
008 011009s1996 xxu 00 eng
020 _a0821336703
039 9 _a200110251507
_brosnah
_y10-09-2001
_znorjismi
090 _aWorld Bank 7 B356 1996 no.325 (T)
090 _aWorld Bank 7
100 1 _aBacon, Robert,
_d1942-
245 1 _aEstimating construction costs and schedules :
_bexperience with power generation projects in developing countries /
_cRobert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian.
260 _aWashington, D.C. :
_bThe World Bank,
_c1996
300 _axv. 120 p. :
_bill.;
_c27 cm.
440 _aWorld Bank technical paper;
_vno.325
_953354
440 _aEnergy series
504 _aIncludes bibliographical references: p.119-120
650 0 _aElectric power plants
_xDesign and construction
_xEstimates
_zDeveloping Countries
650 0 _aElectric power plants
_zDeveloping Countries
_xCosts
_xStatistics
700 1 _aBesant-Jones, John,
_d1941-
700 1 _aHeidarian, Jamshid.
710 2 _aWorld Bank.
_948757
907 _a.b12922961
_b2021-05-28
_c2019-11-12
942 _c4
_n0
_kWorld Bank 7 B356 1996 no.325 (T)
914 _avtls000303838
991 _aBahagian Koleksi Dokumen
998 _at
_b2001-09-10
_cm
_da
_feng
_gxxu
_y0
_z.b12922961
999 _c292770
_d292770