| 000 | 01340nam a2200325 4500 | ||
|---|---|---|---|
| 005 | 20250930113221.0 | ||
| 008 | 011009s1996 xxu 00 eng | ||
| 020 | _a0821336703 | ||
| 039 | 9 |
_a200110251507 _brosnah _y10-09-2001 _znorjismi |
|
| 090 | _aWorld Bank 7 B356 1996 no.325 (T) | ||
| 090 | _aWorld Bank 7 | ||
| 100 | 1 |
_aBacon, Robert, _d1942- |
|
| 245 | 1 |
_aEstimating construction costs and schedules : _bexperience with power generation projects in developing countries / _cRobert W. Bacon, John E. Besant-Jones, and Jamshid Heidarian. |
|
| 260 |
_aWashington, D.C. : _bThe World Bank, _c1996 |
||
| 300 |
_axv. 120 p. : _bill.; _c27 cm. |
||
| 440 |
_aWorld Bank technical paper; _vno.325 _953354 |
||
| 440 | _aEnergy series | ||
| 504 | _aIncludes bibliographical references: p.119-120 | ||
| 650 | 0 |
_aElectric power plants _xDesign and construction _xEstimates _zDeveloping Countries |
|
| 650 | 0 |
_aElectric power plants _zDeveloping Countries _xCosts _xStatistics |
|
| 700 | 1 |
_aBesant-Jones, John, _d1941- |
|
| 700 | 1 | _aHeidarian, Jamshid. | |
| 710 | 2 |
_aWorld Bank. _948757 |
|
| 907 |
_a.b12922961 _b2021-05-28 _c2019-11-12 |
||
| 942 |
_c4 _n0 _kWorld Bank 7 B356 1996 no.325 (T) |
||
| 914 | _avtls000303838 | ||
| 991 | _aBahagian Koleksi Dokumen | ||
| 998 |
_at _b2001-09-10 _cm _da _feng _gxxu _y0 _z.b12922961 |
||
| 999 |
_c292770 _d292770 |
||