| 000 | 00873nam a2200241 a 4500 | ||
|---|---|---|---|
| 005 | 20250930111720.0 | ||
| 008 | 000120s1977 my 00 eng | ||
| 039 | 9 |
_a200808211516 _bwahida _c200009271056 _dasiah _y01-20-2000 _zVLOAD |
|
| 090 | _aMK10 FIDA 3 P76 | ||
| 090 |
_aMK10 FIDA 3 _bP76 1977 |
||
| 245 | 0 | 0 |
_aProject study on the proposed Dungun integrated timber complex / _cFederal Industrial Development Authority |
| 260 |
_aKuala Lumpur : _bFederal Industrial Development Authority, _c1977 |
||
| 300 |
_a114 p. ; _c33 cm |
||
| 650 | 0 |
_aTimber _zMalaysia |
|
| 710 | 2 |
_aLembaga Kemajuan Perindustrian Persekutuan _949684 |
|
| 907 |
_a.b12634712 _b2021-05-28 _c2019-11-12 |
||
| 942 |
_c4 _n0 _kMK10 FIDA 3 P76 |
||
| 914 | _avtls000272221 | ||
| 990 | _aswa | ||
| 991 | _aKoleksi Dokumen | ||
| 998 |
_at _b2000-07-01 _cm _da _feng _gmy _y0 _z.b12634712 |
||
| 999 |
_c264302 _d264302 |
||