| 000 | 00742nam a2200217 a 4500 | ||
|---|---|---|---|
| 005 | 20250930111651.0 | ||
| 008 | 000120s1980 my 00 eng d | ||
| 039 | 9 |
_y01-20-2000 _zVLOAD |
|
| 090 | _aXM | ||
| 245 | 0 | 0 | _aOperation and maintenance of cableway installations |
| 260 | _aKuala Lumpur, Drainage and Irrigation Division, Ministry ofAgriculture Malaysia, 1982 | ||
| 300 | _a16 p. | ||
| 440 | _aHydrological procedure; no. 23 | ||
| 650 | _aBridges, Cable-Stayed | ||
| 710 | 1 |
_aMalaysia. _bKementerian Pertanian. _bBahagian Parit dan Taliair _958671 |
|
| 907 |
_a.b12627598 _b2021-05-28 _c2019-11-12 |
||
| 942 |
_n0 _kXM |
||
| 914 | _avtls000271427 | ||
| 998 |
_anone _b2000-07-01 _cm _da _feng _gmy _y0 _z.b12627598 |
||
| 999 |
_c263608 _d263608 |
||