| 000 | 01557nam a2200241 a 4500 | ||
|---|---|---|---|
| 005 | 20250930111418.0 | ||
| 008 | 991231s1985 my 00 eng d | ||
| 039 | 9 |
_a200301171123 _bsahabinar _c200301171116 _dsahabinar _c200301171115 _dsahabinar _c200301171111 _dsahabinar _y12-31-1999 _zVLOAD |
|
| 090 | _aMK10 JPS 3 G678 | ||
| 245 | 0 | 0 |
_aGolok River Basin Development Study / _cprepared by Snowy Mountains Engineering Corporation in association with Mc Gowan International Pte. Ltd. on behalf of Australian Development Assistance Bureau |
| 260 |
_a[s.l.]: _b[s.n.], _c1985 |
||
| 300 | _a13v. | ||
| 500 | _aMerupakan'Final report' bagi Golok River Basin Development. Mengandungi : vol.1 - Draft final report : Basin development; vol.2 - Hydrology report (vol.1); vol.3 - Geology report; vol.4 - Irrigation and drainage report; vol.5 - Report on river mouth and hear coastal study; vol.6 - Agrarian structure report; vol.7 - Survey report; vol.8 - Report on water resources and flood mitigation. | ||
| 500 | _aVol.9 - Report on rural sector activities; vol.10 - Reports on rural infrastructure; vol.11 - Draft final report : Basin development plan; vol.12 - Report on rural sector activities; vol.13- Reports on soils and land use and environmental studies | ||
| 650 |
_aWatersheds _zMalaysia |
||
| 710 | 1 |
_aMalaysia _957893 |
|
| 907 |
_a.b12588064 _b2019-11-12 _c2019-11-12 |
||
| 942 |
_c4 _n0 _kMK10 JPS 3 G678 |
||
| 914 | _avtls000267214 | ||
| 991 | _aBahagian Koleksi Dokumen | ||
| 998 |
_at _b1999-05-12 _cm _da _feng _gmy _y0 _z.b12588064 |
||
| 999 |
_c259865 _d259865 |
||