| 000 | 01129nam a2200349 a 4500 | ||
|---|---|---|---|
| 005 | 20250914091545.0 | ||
| 008 | 991213s1999 xxua 001 0 eng | ||
| 010 | _a98-028269 | ||
| 020 | _a0471291676 /c RM221.10 | ||
| 039 | 9 |
_a199912131409 _bbedah _y12-13-1999 _zbedah |
|
| 090 | _aTS157.5.C67 1999 | ||
| 090 | _aTS157.5 | ||
| 100 | 1 | _aCorrell, James G. | |
| 245 | 1 |
_aGaining Control : _bcapacity management and scheduling / _cJames G. Correll Norris W. Edson |
|
| 250 | _a2nd ed. | ||
| 260 |
_aNew York : _bJohn Wiley & Sons, _c1999 |
||
| 300 |
_axii, 270 p. : _bill. ; _c23 cm. |
||
| 440 | 0 | _aOliver Wigh manufacturing series. | |
| 500 | _aIncludes index. | ||
| 650 | 0 | _aProduction scheduling. | |
| 650 | 0 | _aManufacturing resource planning. | |
| 650 | 0 | _aJust-in-time systems. | |
| 650 | 0 |
_aIndustrial capacity _xManagement |
|
| 700 | 1 | _aEdson, Norris W | |
| 907 |
_a.b12567541 _b2020-10-15 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTS157.5.C67 1999 |
||
| 914 | _avtls000264952 | ||
| 990 | _aROSNAH | ||
| 991 | _aFakulti Kejuteraan | ||
| 998 |
_al _b1999-01-12 _cm _da _feng _gxxu _y0 _z.b12567541 |
||
| 999 |
_c257874 _d257874 |
||