000 01129nam a2200349 a 4500
005 20250914091545.0
008 991213s1999 xxua 001 0 eng
010 _a98-028269
020 _a0471291676 /c RM221.10
039 9 _a199912131409
_bbedah
_y12-13-1999
_zbedah
090 _aTS157.5.C67 1999
090 _aTS157.5
100 1 _aCorrell, James G.
245 1 _aGaining Control :
_bcapacity management and scheduling /
_cJames G. Correll Norris W. Edson
250 _a2nd ed.
260 _aNew York :
_bJohn Wiley & Sons,
_c1999
300 _axii, 270 p. :
_bill. ;
_c23 cm.
440 0 _aOliver Wigh manufacturing series.
500 _aIncludes index.
650 0 _aProduction scheduling.
650 0 _aManufacturing resource planning.
650 0 _aJust-in-time systems.
650 0 _aIndustrial capacity
_xManagement
700 1 _aEdson, Norris W
907 _a.b12567541
_b2020-10-15
_c2019-11-12
942 _c01
_n0
_kTS157.5.C67 1999
914 _avtls000264952
990 _aROSNAH
991 _aFakulti Kejuteraan
998 _al
_b1999-01-12
_cm
_da
_feng
_gxxu
_y0
_z.b12567541
999 _c257874
_d257874