| 000 | 01029nam a22003018a 4500 | ||
|---|---|---|---|
| 005 | 20250930111102.0 | ||
| 008 | 990903s1999 xxu b 001 0 eng | ||
| 010 | _a98-028547 | ||
| 020 |
_a0139242260 _cRM249.24 |
||
| 039 | 9 |
_a199909281204 _bstaff _y09-03-1999 _zVLOAD |
|
| 090 | _aTS155.Q57 | ||
| 090 | _aTS155 | ||
| 100 | 1 |
_aQuirk, Michael, _d1953- |
|
| 245 | 1 | 0 |
_aManufacturing, teams, and improvement : _bthe human art of manufacturing / _cMichael Quirk. |
| 260 |
_aUpper Saddle River, N.J. : _bPrentice Hall, _c1999. |
||
| 300 |
_a322 p. : _bill. ; _c24 cm. |
||
| 504 | _aIncludes bibliographical references and index. | ||
| 650 | 0 | _aProduction management. | |
| 650 | 0 |
_aTeams in the workplace. _960950 |
|
| 650 | 0 | _aQuality control. | |
| 907 |
_a.b12523823 _b2021-05-28 _c2019-11-12 |
||
| 942 |
_c01 _n0 _kTS155.Q57 |
||
| 914 | _avtls000260147 | ||
| 990 | _amanmon | ||
| 991 | _aJabatan Kejuruteraan Elektrik, Elektronik dan Sistem. | ||
| 998 |
_al _b1999-03-09 _cm _da _feng _gxxu _y0 _z.b12523823 |
||
| 999 |
_c253604 _d253604 |
||