Amazon cover image
Image from Amazon.com

How to implement lean manufacturing / Lonnie Wilson

By: Publication details: New York : McGraw-Hill, c2010Description: xv, 316 p. : ill. ; 25 cmISBN:
  • 9780071625074 (hbk.)
  • 0071625070 (hbk.)
Subject(s):
Contents:
What is the perspective of this book? -- Lean manufacturing and the Toyota production system -- Inventory and variation -- Lean manufacturing simplified -- The significance of lead time -- How to do lean--cultural change fundamentals -- How to do lean--the four strategies to becoming lean -- How to implement lean--the prescription for the lean project -- Planning and goals -- Sustaining the gains -- Cultures -- Constraint management -- Cellular manufacturing -- The story of the Alpha Line -- The story of the Bravo Line : a tale of reduced lead times and lots of early gains -- Using the prescription--three case studies -- The precursors to lean not handled well -- An experiment in variation, dependent events, and inventory -- Assessment tools -- A house of lean -- Glossary
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Materials specified Copy number Status Date due Barcode
AM PERPUSTAKAAN LINGKUNGAN KEDUA PERPUSTAKAAN LINGKUNGAN KEDUA KOLEKSI AM-P. LINGKUNGAN KEDUA TS157.W538 3 (Browse shelf(Opens below)) 1 Available 00002022097

Includes bibliographical references and index

What is the perspective of this book? -- Lean manufacturing and the Toyota production system -- Inventory and variation -- Lean manufacturing simplified -- The significance of lead time -- How to do lean--cultural change fundamentals -- How to do lean--the four strategies to becoming lean -- How to implement lean--the prescription for the lean project -- Planning and goals -- Sustaining the gains -- Cultures -- Constraint management -- Cellular manufacturing -- The story of the Alpha Line -- The story of the Bravo Line : a tale of reduced lead times and lots of early gains -- Using the prescription--three case studies -- The precursors to lean not handled well -- An experiment in variation, dependent events, and inventory -- Assessment tools -- A house of lean -- Glossary

There are no comments on this title.

to post a comment.

Contact Us

Perpustakaan Tun Seri Lanang, Universiti Kebangsaan Malaysia
43600 Bangi, Selangor Darul Ehsan,Malaysia
+603-89213446 – Consultation Services
019-2045652 – Telegram/Whatsapp
Email: helpdeskptsl@ukm.edu.my

Copyright ©The National University of Malaysia Library